The Project

To demolish the existing bridge and associated masonry to communal entrance of residential block and build new to structural engineer and surveyor’s specifications.

 

The Process

The job involved setting up a safe working perimeter, demolishing the existing concrete bridge, side steps and returns of brickwork.

We then formed a new reinforced bridge and stairs as per the specification provided, and tiled to finish. The associated masonry was also renewed and bespoke railings were installed to brickwork.

 

The Challenge

Being a highly technical job and having such crucial health and safety implications, the challenge was to ensure the work was completed to structural perfection and then finished to the highest standard aesthetically.

 

Why Jaggar?

Jaggar were the most competitive in price and our client knew they could fully trust us with a project requiring the utmost professionalism in both the quality of the work carried out and the service provided by our foreman and manager. We ensured the highest level of care at all times so that all health and safety measures were met and the job organised and executed without any issues.

 

What our Customer Said

 

“Myself, the surveyor and the residents are absolutely delighted with the work carried out by Jaggar. They exceeded all expectations. The job was delivered within the allotted time, the progress made between each regular meeting was astonishing. The tiling and finishing has been done to absolute perfection and not only is this bridge now structurally sound, but an attractive feature of the building”

 